Chinese scientists have achieved a milestone in clean energy technology by successfully adding fresh fuel to an operational thorium molten salt reactor, according to state media reports.

It marks the first long-term, stable operation of the technology, putting China at the forefront of a global race to harness thorium – considered a safer and more abundant alternative to uranium – for nuclear power.

The development was announced by the project’s chief scientist, Xu Hongjie, during a closed-door meeting at the Chinese Academy of Sciences on April 8, the official Guangming Daily reported on Friday.

The experimental reactor, located in the Gobi Desert in China’s west, uses molten salt as the fuel carrier and coolant, and thorium – a radioactive element abundant in the Earth’s crust – as the fuel source. The reactor is reportedly designed to sustainably generate 2 megawatts of thermal power.

Some experts see the technology as the next energy revolution and claim that just one thorium-rich mine in Inner Mongolia could – theoretically – meet China’s energy needs for tens of thousands of years, while producing minimal radioactive waste.

A much bigger thorium molten salt reactor is already being built in China and is slated to achieve criticality by 2030. That research reactor is designed to produce 10 megawatts of electricity.

China’s state-owned shipbuilding industry has also unveiled a design for thorium-powered container ships that could potentially achieve emission-free maritime transport.

Meanwhile, US efforts to revive the development of a molten salt reactor remain on paper, despite bipartisan congressional support and Department of Energy initiatives.

Archive link

  • Diplomjodler@lemmy.world
    link
    fedilink
    arrow-up
    6
    ·
    2 days ago

    It’s a logical next step. While these are interesting results, this technology is still a long way from commercial viability. After the 10 MW installation is operational, they’ll have to run it for a few years before they can even start designing a grid scale plant. Or maybe they’ll even have to scale up by another order of magnitude first, which would give only 100MW. Then they have to build it, test it, iron out the kinks etc. Once they have a grid scale plant, they can start commercialising the technology, provided it actually proves viable at scale. We’re looking at 20 to 30 years even at the most optimistic estimate. I’d say 40 is more realistic.